What Happened with the Bathroom Transformation?

14 09 2008

For those of you who are interested in my bathroom transformation (and there seem to be a lot) I don’t mean to have dropped the ball on the topic.  The bulk of the job is finished with just a few final issues to be resolved.  Adorable Little Contractor will be back tomorrow to finish up with the loose ends.

Wheeler Dealer Land Lady had the drain mechanism replaced in the tub.  It is now a sparkling clean chrome drain and overflow/switch (no more plug on a chain.)  That was last Tuesday.  Then Friday and Saturday “Mr. Bathtub” came to refinish the porcelain bathtub.  I didn’t even know it was possible for it to be white again.  The damn thing is GLEAMING!!!  I almost don’t want to use it.

Tomorrow ALC comes back to finish the grout on the shower surround around the tub.  WDLL wanted the tub refinished before he did that.  He will be installing the shower curtain “rod”.  It’s actually a track that is ceiling mounted, instead of a rod mounted to the tile.   I’m happy with this except that it means standard length shower curtains won’t work so well.  I’ve bought a length of chain from The Home Depot and I’m going to suspend the shower curtain from the track so that I can use standard length shower curtains (Extra long ones are extra pricey).  He also has to replace the new light switch with the old light switch.  The new one is an occupancy sensor which is lovely but not needed.  It also has a dimmer switch in it and as a result the lights make a high pitched ringing sound that drives me insane!  So I told WDLL it has to go.

Anyway, I figured since the job was all but done, it was better to wait till it was 100%, take my final “after” shots and post my final Bahtroom Transformation entry.  Sorry to any or all of you who might be waiting with baited breath, but I promise the end result is coming soon.  Thanks for your patience.  :)





Bathroom Transformation Day Nine

3 09 2008

Nine days down, one day to go.  Today finds the tile in, the walls painted, the vanity in position and the basin and counter in place, the faucet installed (though not yet functioning), and the lighting fixture in place.  Take a look:

Tomorrow is supposed to be the last day of the main project:  The sink gets plumbed in.  The fixures (i.e. towel rods, toilet paper dispenser, etc.) get installed.  The mirror and storage cupboard get hung.  I hope the door, door frame, window frame and shutters get painted, and the door rehung.  And there’s still a few baseboard tiles to get grout.  Friday Adorable Little Contractor is off to Oregon.  I still don’t have a shower curtain rod, or a makeshift shower curtain.

Wheeler Dealer Land Lady was referred to a showroom where she should be able to find an existing shower curtain rod.  But apparently, it won’t be installed until Monday, September 15th.  So I’m looking at over a week of using the trickle at the office.  The charm has definitely worn off…  Not that I didn’t get myself a good wank in their anyway, but the new has worn off and without some company, it’s just not what it could be.  Today I revisited the Fantastical Engineer services me and my undercarriage while I rub one out on his shiny bald head fantasy.  I need to come up with something new…

Anyway, someone from a company called “Mr. Bathtub” is coming on Saturday, September 13, 2008 to “redo” my bathtub.  I don’t really know what that means, I just know that my bath tub is supposed to be shiny and pristine and new looking so it will fit in with the rest of the newly redone bathroom!

Adorable Little Contract comes back on September 15th to hang the shower curtain rod, grout the gap between the tub and the tile and resolve any open items that haven’t been solved.

It’s kind of funny, but there’s a part of me that is sad that it’s ending.  Scared kitty will be glad it’s over as he has been spending his days locked up in the kitchen with no soft furniture to sleep on and where it gets somewhat steamy.  But I can’t have him roaming free while ALC is trying to do his work and often needs to leave the front door open.  I admit that I expected to see more of ALC.  I got the impression from him at the beginning of this endeavor that he’d be working long days and that I’d see him, probably before I left for work and almost certainly when I got home.  In a strange way, when this first started, I almost felt like I had a husband to come home too (and I could certainly have done worse.)  I expected more discussions about schedules and when we’d see each other and the like.  I guess, truthfully I’m grateful that we didn’t interact more, since his presence is a disruption for me, but I hoped for more contact.

The more I think about it, the more I think he very well might be a Friend of Dorothy.  I recall that his use of pronouns (In his limited discussion about himself) never went beyond “we”.  He never talked about “she” or “my wife” or “my girlfriend”.  Though, admittedly he also never talked about a boyfriend or husband.  It has been extremely hot these last two weeks and I don’t have air conditioning which means that it’s been quite hot in my house while he works.  I’ve seen him in shorts twice now – and he has great calves. He seems not to have much (if any) hair on his legs either.  He’s as ‘average white” as I am so it’s not like he’s likely of a heritage that doesn’t grow much body hair.  I do believe he’s blond but not super light to where his body hair should be unnoticeable… Of course I realize there are all kinds of simple explanations for this that don’t make him gay, but then again, maybe he is…  He has a great little ass and small waist too!

Tonight, as I was gathering the ingredients for my dinner, my front door open but outer gate closed and locked and with me wearig no clothes, I daydreamed/fantacized about him coming back to the house to do more work and letting himself in never expecting to find me naked.  My fantacy didn’t go beyond the awkward…

ALC: Oh!  I’m sorry, I didn’t realize…

Me: Oh my God.  I didnt’ think…  I’m sorry…  I’ll just go put some clothes on…  Unless…  Well, unless you like what you see, in which case I won’t… ‘Cause I’ve been thoroughly enjoying what I’ve been seeing…

The fantacy didn’t go beyond that point, but wouldn’t it have been nice…





Bathroom Transformation Days Seven and Eight

2 09 2008

I must apologize to those of you who have been following this particular thread (Fixator) for the lapse in updates.

I sort of expected that nothing much would happen yesterday, since it was Labor Day and since Adorable Little Contractor spent all day Saturday here working on the floor.  I took advantage of the long weekend and I did made my bi-wekekley trip to M&Ms apartment to do my laundry.  Because I was expecting Adorable Little contractor to be here around 9:00, I got up and out early.  I arrived at M&Ms house around 9:30 and started my laundry….  OK…  Before I get too far down that road, let me remember that nothing exciting happened.  Around 2:00 in the afternoon, we headed off to Dave and Busters in Milpitas, CA.  I’ve never been there before so it was interesting (and kinda dissapointing – I thought there’d be more to it.)  It was fun enough, but I’m not sure how worth the trouble it was… 

I did the Fast and the Furious races several times.  Raced against both M&M (AKA Green M&M) and her sister Yellow M&M.  They both beat me…  REPEATEDLY.  Later we went to a motor cycle racing game….  They beat me theere too…  and NONE of us knew how to ride a motorcycle. 

Beaten by girls…  Over and over.  I really am a sissy… :)

Green and I watched I Now Pronounce You Chuck & Larry too.  It was really good, I thought. 

Anyway, I got home around 10:30 PM.  The first thing I noticed when I walked in the house was that it smelled kind of like paint.  I wasn’t expecting painting yesterday.  As far as I knew, the floor was going to be grouted and sealed yesterday.  So I went in to check it out, only the new light fixture hasn’t been installed yet so there was no light in there besides the hall light.  The walls appeared to be mint green.  Really bad!!!!

Green said “At least it’s not pink.” 

“Um yeah…  Mint Green is NOT good.”  I would have really hated to have had him paint the whole room just to hate the color.  Fortuantely, I realized that was just the primer.  ALC had taken down the thick plastic he had hung and he rehung it from the walls instead of the cieling.  My shower this morning was a little more… intricate than normal.  There was a big gap in the curtain that, had I not been careful, would have spilled water all over the floor behind the toilet. 

So it’s clear to me that I need to take my “after” pictures in day light but here goes all the same…

I came home tonight to find this. 

  I really like the color, but it doesn’t show up very well on the pictures.  Hopefully, in the daytime with full daylight it’ll be clearer.  I was having second thoughts when Whealer Dealer LandLady backtracked on her conditions for me picking the color (I have to return it to “antique white” when I moe out) of paint but now that I’ve seen the final result I’m very glad I didn’t back out.  I’m planning to paint the rest of my apartment when I get the chance.  The vanity is going to look nice once it’s finished and installed.  Things are looking pretty good.  I just wish I had a shower curtain.   Thanks to the painting, the make shift shower curtain has been removed and now I’m either supposed to try and carefully use my handheld shower wand without a shower curtain, or I’m going to have to go back to using the trickle in the basement at work.  Neither one is terribly appealing to me.  I don’t guess I have much of a choice though.  I hope that the new shower rod will be installed soon.  It looks to me, like ALC should be finished in the next day or three with his part of the renovations.





Bathroom Transformation Day Six

30 08 2008

Somewhat surprisingly, Adorable Little Contractor came back today to lay the tile for the floor.  He told me yesterday that it would be a half-day job.  He showed up at around 9:30 this morning and was here until about 6:15 this evening.

 

The tile is fragile and the floor was put in, in a diamond pattern so there was a lot of cutting to be done.  It took a lot longer than ALC had expected.  The tile is in and glued down but the grout won’t go in till Monday morning. 

The shower curtain issue is sort of resolved.  ALC hung a curtain of thick plastic from the ceiling by staples so that i could use the shower.  But the guy who is making the curtain rod won’t be here till “sometime” next week to see what’s needed and who knows how long it’ll take to fabricate and be installed.  Meanwhile, Adorable Little Contractor wants to do the painting on Tuesday, which should include the ceiling so I’m not sure what that will mean for me and my ability to shower at home. 

Today was the day I was hoping to avoid in that this was the day he had to take the toilet out.  It was out of commission for about 8 hours.  I actually ended up peeing in the kitchen sink once.  Shhh!  Don’t tell anybody.  Wasn’t my ideal choice but what was I to do?  I have no idea what Adorable Little Contractor did about his needs, but I can’t help but wonder… or wish I’d been there.

I went out for a while and met up with a couple frineds to go to a movie.  Went to see Disaster Movie.  It was stupid funny as can be.  I love stupid funny, usually.  The last “stupid funny, spoof” movie I saw was Remember The Spartans.  THAT movie sucked in my opinion.  This movie was pretty good.  And it stars Matt Lanter who I have thought was delicious ever since he was on Comander in Chief.  Got me pretty horney!  Come to think of it, I still haven’t done anything about that! 

I was a little worried when I came home and Adorable Little Contractor was still working on the floor and hadn’t put the toilet back.  It’s amazing how much you “need” something when you definately can’t have it.  Fortunately, he was finished about an hour or so later and when I was in need of the toilet, it was ready and waiting. 

Anyway, Adorable Contractors, Sexy Movie Actors, Fantastical Engineers…  I think I need to get LAID!!!





Bathroom Transformation Day Five

29 08 2008

Not a lot of news to tell tonight.  Good Progress, but not big news.

The tile in the shower has been sealed and my shower head has been mounted again.  The black plastic is hung form the ceiling as a temporary shower curtain.  It’ll be another week or two before the new shower curtain rod is fabricated and installed. 

The floor has been “floated” and Adorable Little Contractor is coming back tomorrow to put in the floor tile.  This also means the toilet has to come out which means there’ll be no toilet at my disposal while he’s doing the work.  He will put the toilet back in at the end of every day, but as long as I’m not hanging around the house while he’s working that won’t be a problem.  Since tomorrow is Saturday, however, that may be a problem.  I may have to find somewhere else to be tomorrow…

Today he also took out the medicine cabinet and in wall toilet paper dispenser.  He also installed the second electrical outlet that I requested on the far side of where the vanity will be.  I’ve made the final selection on the paint and he plans to paint on Tuesday. 

I’m glad to have the use of my shower back.  The shower at work was growing tiresome.  As I said yesterday, I believe ever good day starts with a good wank, but it was more of the same.  Same fantasy about the same engineer.  Same trickle of water, meant to provide the cleansing desired from taking a shower in the first place.  It was fun for a time, but now I’m glad I won’t need to use that shower anymore.